top of page

WHITE RIVER HYDROELECTRIC PROJECT

Location: White River, ON 

Date: November 2015 – March 2016

Two (2) power house, 9 MW and 10 MW.  Litostroj vertical Kaplan turbine. B&C Automation supplied technical support and manpower to complete the water to wire for the two generating stations.

bottom of page