top of page

TIMISKAMING DISTRICT SECONDARY SCHOOL

Location: New Liskeard, ON

Date: 2011

FIT 100kw Rooftop Solar System

ÉCOLE SECONDAIRE CATHOLIQUE STE-MARIE, CSCDGR

Location: New Liskeard, ON

Date: 2011

FIT 100kw Rooftop Solar System

TOWN OF HEARST

Location: Hearst, ON

Date: 2011

9 ground mount Degertracker 10kw,  3 building intergrated Degertracker 10 kw

HEARST SKI CLUB SOLAR SYSTEM

Location: Hearst, ON

Date: 2009

Supplied and installed solar equipment to light up close to 4 Km of trail at the local Cross-country ski club for night skiing.

Please reload

Club de ski

KAPUSKASING AIRPORT WATER TREATMENT PLANT

Location: Kapuskasing, ON

Date: 2013

Instrumentation and controls upgrade of the complete water treatment plant.

REFINER PROJECT

Location: Tembec Spruce Falls - Kapuskasing, ON

Date: 2012 - 2013

Instrumentation, controls and power wiring for a new process in the paper mill.

BROOKFIELD POWER

Location: Shekak Station, ON

Date: 2012

Power house PLC upgrade. 

Complete replacement of the powerhouse PLC and commissioning of the new system.

LACWOOD DRY KILN

Location: Hallébourg, ON

Date: 2012

Control and power wiring of a new dry kiln, commissioning of complete installation.

YELLOW FALLS - 16 MW run-of-river hydroelectric power station

Location: Mattagami River, south of Smooth Rock Falls, ON

Date: on going project

Powerhouse containing two (2) 8 MW turbines (16 MW total) that are closely coupled to the intake, concrete dam, spill facilities including two sections or rubber dam and related infrastructures across the Mattagami River at Yellow Falls.

Please reload

bottom of page