TIMISKAMING DISTRICT SECONDARY SCHOOL
Location: New Liskeard, ON
Date: 2011
FIT 100kw Rooftop Solar System
ÉCOLE SECONDAIRE CATHOLIQUE STE-MARIE, CSCDGR
Location: New Liskeard, ON
Date: 2011
FIT 100kw Rooftop Solar System
TOWN OF HEARST
Location: Hearst, ON
Date: 2011
9 ground mount Degertracker 10kw, 3 building intergrated Degertracker 10 kw
HEARST SKI CLUB SOLAR SYSTEM
Location: Hearst, ON
Date: 2009
Supplied and installed solar equipment to light up close to 4 Km of trail at the local Cross-country ski club for night skiing.
KAPUSKASING AIRPORT WATER TREATMENT PLANT
Location: Kapuskasing, ON
Date: 2013
Instrumentation and controls upgrade of the complete water treatment plant.
REFINER PROJECT
Location: Tembec Spruce Falls - Kapuskasing, ON
Date: 2012 - 2013
Instrumentation, controls and power wiring for a new process in the paper mill.
BROOKFIELD POWER
Location: Shekak Station, ON
Date: 2012
Power house PLC upgrade.
Complete replacement of the powerhouse PLC and commissioning of the new system.
LACWOOD DRY KILN
Location: Hallébourg, ON
Date: 2012
Control and power wiring of a new dry kiln, commissioning of complete installation.
YELLOW FALLS - 16 MW run-of-river hydroelectric power station
Location: Mattagami River, south of Smooth Rock Falls, ON
Date: on going project
Powerhouse containing two (2) 8 MW turbines (16 MW total) that are closely coupled to the intake, concrete dam, spill facilities including two sections or rubber dam and related infrastructures across the Mattagami River at Yellow Falls.